Projects

Flagship Project

Ecogrid Infrastructure is developing a 7MW Waste-to-Energy facility in Abuja.
A first of its kind project designed to convert municipal solid waste into clean electricity.

Key
Features


1. Capacity: 7MW

2. Feedstock: Municipal solid waste.

3. Technology: Waste-to-Energy (thermal/biogas).

4. Outputs: Electricity, recyclable by-products.  

Project
Benefits


1. Reduces landfill waste.

2. Improves sanitation and environmental quality.

3. Creates green jobs.

4. Supports Nigeria's Renewable Energy Targets.

5. Demonstrates Scalable WtE Technology for Nationwide Replication.

Status


Engineering design and development phase.

Award Section

Future Pipeline

  • 7MW WtE plants in major cities.

  • Solar hybrid mini grids for rural electrification

  • Industrial waste-to-energy systems

  • Smart grid and energy efficiency technology


Ecogrid Infrastructure – Nigeria’s National Waste‑to‑Energy Platform.

This allows Ecogrid to scale rapidly across 5–10 Nigerian cities, creating a national network of WtE plants that deliver clean power, reduce landfill pressure, and generate strong financial returns.

1. Platform Vision


Ecogrid Infrastructure is developing Nigeria’s first integrated Waste‑to‑Energy (WtE) platform, designed to convert municipal solid waste into reliable baseload electricity across major urban centers.

The platform is built on a cookie‑cutter model:
Identical 7 MW WtE plants
Identical EPC structure
Identical OPEX profil
Identical PPA model
Identical waste supply concession model

Cookie-cutter Model


Every plant uses:
The same EPC contractor.
The same turbine technology.
The same emissions control system.
The same O&M structure.
The same PPA template.
The same waste concession model.

Portfolio Financials – 10‑Plant National Network


Portfolio Capacity 70MW baseload renewable power.

Equivalent to powering 140,000 industrial households.

Waste processing: 3 million tons/year.


National Multi‑City Rollout Strategy (2027–2035)

Phase 1 (2027–2029): Foundation

Icon

Abuja (7MW)

Waste: 3,500–4,000 tons/day

Industrial tariff: ₦200–₦250/kWh

FCFE: ₦13.6B/year

Icon

Lagos
(7MW)

Waste: 13,000 tons/day

Largest industrial base in West Africa

FCFE: ₦13.6B/year

Phase 2 (2030–2032): Expansion

Icon

Port Harcourt (7MW)

Oil & gas industrial clusters

High diesel dependency

Icon

Kano (7MW)

Manufacturing hub

Large waste generation

Icon

Ibadan (7MW)

Rapid urbanization

Strong industrial demand

Phase 3 (2033–2035): National Scale

Icon

Kaduna (7MW)

Icon

Onitsha (7MW)

Icon

Benin (7MW)

Icon

Warri (7MW)

Icon

Enugu (7MW)

Why These Cities Work

Each target city has:

1,000 tons/day of municipal waste
₦150/kWh industrial tariff
40% grid unreliability

Large industrial clusters
Strong demand for baseload power.

This ensures consistent feedstock, consistent demand, and consistent economics.